vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
Vertical wet pit pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical sump pump
vertical sump pump
vertical sump pump
vertical sump pump
Right Angle Gearboxes
Right Angle Gearboxes
Right Angle Gearboxes

Current Location: HOME /Knowledge /vertical turbine pump

Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps)

Date:2024/11/20 17:34:34Clicks:

 Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps)

Inlet flow disturbances, such as swirl, unbalance in the distribution of velocities and pressures, and sudden variations in velocity can be harmful to the hydraulic performance of a Canned Vertical Turbine Pump (double casing vertical barrel centrifugal pump) , its mechanical behavior, and its reliability.

The minimum required straight pipe length (L2) before pump suction inlet is specified.

The straight pipe section is to be the same diameter as that of the Canned Vertical Turbine Pump (double casing vertical barrel centrifugal pump) section nozzle.

The pipe length L2 depends on the distance between suction nozzle and hydraulic inlet L1 and on the Can inner diameter øD1.

Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps).jpg



Scan and add WeChat

TEL:

008618507312158 Xiangyin Industrial Park, Jinlong Town, Xiangyin County, Hunan Province, China susie@hnljpump.com
Copyright 2004-2024 Hunan Perfect Industry Co., ltd  Case Number:湘ICP备2023000934号  China Vertical Turbine Pump Manufacturers